Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
ASME Sec-VIII Petrochemical Hydrocracker Reactor
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
29.6 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
15.80%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
100% Linear-Accel Radiograph
1 < 2/day
Limit: downtime
100% Linear-Accel Radiograph: capacity 1/day vs demand 2/day. Main limit: downtime. Raw C/T 8.1 h, effective C/T 10.1 h.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,722,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
15.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Forged CrMo Rings
220mm Clad CrMo Forgings
Weekly Steel Barge · LT 10d
PRODUCTION CONTROL / ERP
ETO ERP
Drydock Critical Block Hold
CUSTOMER
Refinery & Ammonia Pl…
2 units/d
Takt: 7.5 h
EDI / Block Crane Slot
MRP / Weekly Steel Barge
★ PACEMAKER
IN
Insert a step at the start
+
I
4
2.00 d
Drag to reorder step 1
PLATE LINE
1. 304SS Internal W…
×3
Push Flow
C/T
5.0 h
C/O
30 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
3 / 2d
OEE
92.0%
i
Insert a step here
+
I
4
2.00 d
Drag to reorder step 2
PANEL HALL
2. Narrow-Gap Sub-A…
×4
Push Flow
C/T
6.0 h
C/O
35 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
2 / 2d
OEE
86.3%
i
Insert a step here
+
I
5
2.50 d
FLOW
Pre-Outfi…
Drag to reorder step 3
BLOCK SHOP
3. 100% Linear-Acce…
×6
BOTTLENECK
C/T
8.1 h
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
2 / 2d
OEE
76.1%
i
Insert a step here
+
I
3
1.50 d
Drag to reorder step 4
PAINT CELL
4. Full Furnace PWH…
×3
Push Flow
C/T
5.9 h
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
2 / 2d
OEE
87.5%
i
Insert a step here
+
I
2
1.00 d
Drag to reorder step 5
DRYDOCK
5. Barge Heavy-Haul…
×5
FIFO Lane
C/T
4.7 h
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
1 / 1d
OEE
92.4%
i
Insert a step at the end
+
I
3
1.50 d
Finished Goods
OUT
2.00 d
VA 5.0 h
2.00 d
VA 6.0 h
2.50 d
VA 8.1 h
1.50 d
VA 5.9 h
1.00 d
VA 4.7 h
1.50 d
Total Lead Time
12.5 d
VA Time
29.6 h
PCE
15.80%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step