Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
SaaS Feature Delivery Pipeline
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.46 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.48%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Regression QA Bench
16 < 25/day
Limit: scrap
Regression QA Bench: capacity 16/day vs demand 25/day. Main limit: scrap. Raw C/T 19.3 min, effective C/T 25.5 min.
Quality (RTY)
62.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€79,220
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Product & UX Design
Validated User Stories
Weekly Sprint · LT 5d
PRODUCTION CONTROL / ERP
Issue Tracker + Git CI/CD
Scrum Sprint Batch Push
CUSTOMER
Enterprise SaaS Tenan…
25 tickets/d
Takt: 18.0 min
EDI / Weekly Release
MRP / Weekly Sprint
★ PACEMAKER
IN
Insert a step at the start
+
I
55
2.20 d
Drag to reorder step 1
PRODUCT
1. Backlog Refineme…
×2
Push Flow
C/T
11.2 min
C/O
15 min
Availability
96%
Quality FPY
91.0%
Batch / EPEI
13 / 1d
OEE
81.8%
i
Insert a step here
+
I
45
1.80 d
Drag to reorder step 2
ENGINEERING
2. Feature Coding
×5
Push Flow
C/T
15.1 min
C/O
12 min
Availability
92%
Quality FPY
88.5%
Batch / EPEI
10 / 1d
OEE
76.0%
i
Insert a step here
+
I
35
1.40 d
Drag to reorder step 3
TECH LEADS
3. Code Review & Se…
×2
Push Flow
C/T
10.1 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
5 / 1d
OEE
83.4%
i
Insert a step here
+
I
60
2.40 d
AUTOMATION
Playwrigh…
Drag to reorder step 4
QA TEAM
4. Regression QA Be…
×2
BOTTLENECK
C/T
19.3 min
C/O
35 min
Availability
88%
Quality FPY
86.0%
Batch / EPEI
25 / 2d
OEE
69.8%
i
Insert a step here
+
I
18
0.72 d
Drag to reorder step 5
SRE / OPS
5. Canary Prod Depl…
×1
Continuous Flow
C/T
7.6 min
C/O
8 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
3 / 1d
OEE
81.4%
i
Insert a step at the end
+
I
20
0.80 d
Finished Goods
OUT
2.20 d
VA 11.2 min
1.80 d
VA 15.1 min
1.40 d
VA 10.1 min
2.40 d
VA 19.3 min
0.72 d
VA 7.6 min
0.80 d
Total Lead Time
9.46 d
VA Time
1.1 h
PCE
1.48%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step