Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
9.61 d
Value-Added
1.9 h
Efficiency (PCE)
2.61%
BottleneckASPICE Traceability Sign
9 < 14/day
Limit: scrap
Quality (RTY)
62.8%
WIP Capital
€314,400
Carbon CO₂
3.2 t CO₂e/year