Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
22.5 min
Lead Time (LT)
9.48 d
Value-Added
1.3 h
Efficiency (PCE)
1.85%
BottleneckOnline Index Dual-Write Run
13 < 20/day
Limit: scrap
Quality (RTY)
62.8%
WIP Capital
€57,660
Carbon CO₂
4.5 t CO₂e/year