Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
14.1 min
Lead Time (LT)
9.42 d
Value-Added
49.4 min
Efficiency (PCE)
1.16%
BottleneckCAB Cutover Window Sign
21 < 32/day
Limit: scrap
Quality (RTY)
62.8%
WIP Capital
€116,220
Carbon CO₂
7.3 t CO₂e/year