Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
ERP Monthly Release & Transport Train
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.42 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
49.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CAB Cutover Window Sign
21 < 32/day
Limit: scrap
CAB Cutover Window Sign: capacity 21/day vs demand 32/day. Main limit: scrap. Raw C/T 15.1 min, effective C/T 19.9 min.
Quality (RTY)
62.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€116,220
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Functional ERP Consul…
Custom Transport Reques…
Weekly Sprint · LT 5d
PRODUCTION CONTROL / ERP
Change Request Tool
Scrum Sprint Batch Push
CUSTOMER
30 Global Factory Pla…
32 tickets/d
Takt: 14.1 min
EDI / Weekly Release
MRP / Weekly Sprint
★ PACEMAKER
IN
Insert a step at the start
+
I
70
2.19 d
Drag to reorder step 1
PRODUCT
1. Dev Unit & ATC C…
×2
Push Flow
C/T
8.7 min
C/O
15 min
Availability
96%
Quality FPY
91.0%
Batch / EPEI
16 / 1d
OEE
81.5%
i
Insert a step here
+
I
58
1.81 d
Drag to reorder step 2
ENGINEERING
2. QAS Integration …
×5
Push Flow
C/T
11.8 min
C/O
12 min
Availability
92%
Quality FPY
88.5%
Batch / EPEI
13 / 1d
OEE
76.1%
i
Insert a step here
+
I
45
1.41 d
Drag to reorder step 3
TECH LEADS
3. Cross-Plant Regr…
×2
Push Flow
C/T
7.9 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
6 / 1d
OEE
83.1%
i
Insert a step here
+
I
77
2.41 d
AUTOMATION
Playwrigh…
Drag to reorder step 4
QA TEAM
4. CAB Cutover Wind…
×2
BOTTLENECK
C/T
15.1 min
C/O
35 min
Availability
88%
Quality FPY
86.0%
Batch / EPEI
32 / 2d
OEE
69.8%
i
Insert a step here
+
I
22
0.69 d
Drag to reorder step 5
SRE / OPS
5. Prod Import & Ba…
×1
Continuous Flow
C/T
5.9 min
C/O
8 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
3 / 1d
OEE
77.4%
i
Insert a step at the end
+
I
26
0.81 d
Finished Goods
OUT
2.19 d
VA 8.7 min
1.81 d
VA 11.8 min
1.41 d
VA 7.9 min
2.41 d
VA 15.1 min
0.69 d
VA 5.9 min
0.81 d
Total Lead Time
9.42 d
VA Time
49.4 min
PCE
1.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen