Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
PCI-DSS Compliant Payment Core Hotfix Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
50.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.47 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Zero-Downtime Rolling Deploy
12 < 18/day
Limit: scrap
Zero-Downtime Rolling Deploy: capacity 12/day vs demand 18/day. Main limit: scrap. Raw C/T 53.5 min, effective C/T 1.2 h.
Quality (RTY)
62.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€80,160
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Core Ledger Engineers
PCI Verified Security D…
Weekly Sprint · LT 5d
PRODUCTION CONTROL / ERP
Service Mgmt Platform
Scrum Sprint Batch Push
CUSTOMER
Live Payment Clearing…
18 tickets/d
Takt: 50.0 min
EDI / Weekly Release
MRP / Weekly Sprint
★ PACEMAKER
IN
Insert a step at the start
+
I
40
2.22 d
Drag to reorder step 1
PRODUCT
1. Severity-1 Bug R…
×2
Push Flow
C/T
31.0 min
C/O
15 min
Availability
96%
Quality FPY
91.0%
Batch / EPEI
9 / 1d
OEE
84.4%
i
Insert a step here
+
I
32
1.78 d
Drag to reorder step 2
ENGINEERING
2. Dual-Reviewer Cr…
×5
Push Flow
C/T
42.0 min
C/O
12 min
Availability
92%
Quality FPY
88.5%
Batch / EPEI
7 / 1d
OEE
78.6%
i
Insert a step here
+
I
25
1.39 d
Drag to reorder step 3
TECH LEADS
3. PCI Sandbox Card…
×2
Push Flow
C/T
28.0 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
4 / 1d
OEE
86.1%
i
Insert a step here
+
I
43
2.39 d
AUTOMATION
Playwrigh…
Drag to reorder step 4
QA TEAM
4. Zero-Downtime Ro…
×2
BOTTLENECK
C/T
53.5 min
C/O
35 min
Availability
88%
Quality FPY
86.0%
Batch / EPEI
18 / 2d
OEE
72.7%
i
Insert a step here
+
I
13
0.72 d
Drag to reorder step 5
SRE / OPS
5. Synthetic Canary…
×1
Continuous Flow
C/T
21.0 min
C/O
8 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
87.9%
i
Insert a step at the end
+
I
14
0.78 d
Finished Goods
OUT
2.22 d
VA 31.0 min
1.78 d
VA 42.0 min
1.39 d
VA 28.0 min
2.39 d
VA 53.5 min
0.72 d
VA 21.0 min
0.78 d
Total Lead Time
9.47 d
VA Time
2.9 h
PCE
2.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step