Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.7 min
Lead Time (LT)
9.34 d
Value-Added
16.6 min
Efficiency (PCE)
0.40%
BottleneckStaging Load Chaos Suite
62 < 95/day
Limit: scrap
Quality (RTY)
62.8%
WIP Capital
€128,180
Carbon CO₂
21.6 t CO₂e/year