Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enterprise LLM / ML Model Training-to-Serving
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.47 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.6 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.32%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Inference Quantize & Shadow
10 < 16/day
Limit: scrap
Inference Quantize & Shadow: capacity 10/day vs demand 16/day. Main limit: scrap. Raw C/T 30.1 min, effective C/T 39.8 min.
Quality (RTY)
62.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€140,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Feature Store Data La…
Curated Parquet Datasets
Weekly Sprint · LT 5d
PRODUCTION CONTROL / ERP
MLflow + Kubeflow
Scrum Sprint Batch Push
CUSTOMER
Real-Time Fraud/Recs …
16 batches/d
Takt: 28.1 min
EDI / Weekly Release
MRP / Weekly Sprint
★ PACEMAKER
IN
Insert a step at the start
+
I
35
2.19 d
Drag to reorder step 1
PRODUCT
1. Data Drift & PII…
×2
Push Flow
C/T
17.4 min
C/O
15 min
Availability
96%
Quality FPY
91.0%
Batch / EPEI
8 / 1d
OEE
81.5%
i
Insert a step here
+
I
29
1.81 d
Drag to reorder step 2
ENGINEERING
2. Distributed GPU …
×5
Push Flow
C/T
23.6 min
C/O
12 min
Availability
92%
Quality FPY
88.5%
Batch / EPEI
6 / 1d
OEE
75.6%
i
Insert a step here
+
I
22
1.38 d
Drag to reorder step 3
TECH LEADS
3. Offline Bias & E…
×2
Push Flow
C/T
15.8 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
3 / 1d
OEE
83.1%
i
Insert a step here
+
I
38
2.38 d
AUTOMATION
Playwrigh…
Drag to reorder step 4
QA TEAM
4. Inference Quanti…
×2
BOTTLENECK
C/T
30.1 min
C/O
35 min
Availability
88%
Quality FPY
86.0%
Batch / EPEI
16 / 2d
OEE
69.8%
i
Insert a step here
+
I
11
0.69 d
Drag to reorder step 5
SRE / OPS
5. Canary Latency S…
×1
Continuous Flow
C/T
11.8 min
C/O
8 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
82.0%
i
Insert a step at the end
+
I
13
0.81 d
Finished Goods
OUT
2.19 d
VA 17.4 min
1.81 d
VA 23.6 min
1.38 d
VA 15.8 min
2.38 d
VA 30.1 min
0.69 d
VA 11.8 min
0.81 d
Total Lead Time
9.47 d
VA Time
1.6 h
PCE
2.32%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step