Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Critical CVE Vulnerability Container Patch SLA
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
15.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
52.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.63%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Change Approval Fast Track
41 < 60/day
Limit: scrap
Change Approval Fast Track: capacity 41/day vs demand 60/day. Main limit: scrap. Raw C/T 16.1 min, effective C/T 21.2 min.
Quality (RTY)
62.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€53,010
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
NVD / Vendor Security…
SBOM Container Inventor…
Weekly Sprint · LT 5d
PRODUCTION CONTROL / ERP
SCA + Cloud Security
Scrum Sprint Batch Push
CUSTOMER
Production Cloud Work…
60 tickets/d
Takt: 15.0 min
EDI / Weekly Release
MRP / Weekly Sprint
★ PACEMAKER
IN
Insert a step at the start
+
I
132
2.20 d
Drag to reorder step 1
PRODUCT
1. Auto SBOM Blast …
×2
Push Flow
C/T
9.3 min
C/O
15 min
Availability
96%
Quality FPY
91.0%
Batch / EPEI
30 / 1d
OEE
84.4%
i
Insert a step here
+
I
108
1.80 d
Drag to reorder step 2
ENGINEERING
2. Automated Base-I…
×5
Push Flow
C/T
12.6 min
C/O
12 min
Availability
92%
Quality FPY
88.5%
Batch / EPEI
24 / 1d
OEE
78.7%
i
Insert a step here
+
I
84
1.40 d
Drag to reorder step 3
TECH LEADS
3. Integration Smok…
×2
Push Flow
C/T
8.4 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
12 / 1d
OEE
85.9%
i
Insert a step here
+
I
144
2.40 d
AUTOMATION
Playwrigh…
Drag to reorder step 4
QA TEAM
4. Change Approval …
×2
BOTTLENECK
C/T
16.1 min
C/O
35 min
Availability
88%
Quality FPY
86.0%
Batch / EPEI
60 / 2d
OEE
72.7%
i
Insert a step here
+
I
42
0.70 d
Drag to reorder step 5
SRE / OPS
5. Fleet Re-Deploy …
×1
Continuous Flow
C/T
6.3 min
C/O
8 min
Availability
98%
Quality FPY
97.5%
Batch / EPEI
6 / 1d
OEE
87.1%
i
Insert a step at the end
+
I
48
0.80 d
Finished Goods
OUT
2.20 d
VA 9.3 min
1.80 d
VA 12.6 min
1.40 d
VA 8.4 min
2.40 d
VA 16.1 min
0.70 d
VA 6.3 min
0.80 d
Total Lead Time
9.36 d
VA Time
52.7 min
PCE
0.63%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen