Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
5G Standalone (SA) Urban Macro Site Upgrade
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.34 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CPRI Fiber Drop & DC Power
8 < 14/day
Limit: changeovers
CPRI Fiber Drop & DC Power: capacity 8/day vs demand 14/day. Main limit: changeovers. Raw C/T 34.7 min, effective C/T 45.4 min.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€429,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Mobile Radio Vendors
AAU Antennas & DC Recti…
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
Telco Rollout ERP
Geographic Zone Batching
CUSTOMER
Mobile Network Operat…
14 lines/d
Takt: 32.1 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
28
2.00 d
Drag to reorder step 1
OSS ENG
1. Structural Load …
×3
Push Flow
C/T
21.9 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
4 / 1d
OEE
84.9%
i
Insert a step here
+
I
25
1.79 d
Drag to reorder step 2
CIVIL CREW
2. Crane Climb & AA…
×4
Push Flow
C/T
25.1 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
6 / 1d
OEE
81.3%
i
Insert a step here
+
I
36
2.57 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. CPRI Fiber Drop …
×8
BOTTLENECK
C/T
34.7 min
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
4 / 1d
OEE
64.5%
i
Insert a step here
+
I
11
0.79 d
Drag to reorder step 4
FIELD TECH
4. RAN Parameter & …
×3
FIFO Lane
C/T
23.2 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
2 / 1d
OEE
84.8%
i
FIFO
Insert a step here
+
I
6
0.43 d
Drag to reorder step 5
NOC / OSS
5. NOC Commercial 5…
×1
Continuous Flow
C/T
14.5 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
97.7%
i
Insert a step at the end
+
I
7
0.50 d
Finished Goods
OUT
2.00 d
VA 21.9 min
1.79 d
VA 25.1 min
2.57 d
VA 34.7 min
0.79 d
VA 23.2 min
0.43 d
VA 14.5 min
0.50 d
Total Lead Time
8.34 d
VA Time
2.0 h
PCE
3.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step