Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Metro Dark Fiber Ring Lease & Splicing Turn-Up
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.46 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.48%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mid-Span Splice Vault Closure
5 < 8/day
Limit: changeovers
Mid-Span Splice Vault Closure: capacity 5/day vs demand 8/day. Main limit: changeovers. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€185,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Municipal Duct Condui…
144F Armored Metro Cabl…
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
GIS Network ERP
Geographic Zone Batching
CUSTOMER
HFT Finance & Data Ce…
8 lines/d
Takt: 56.3 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
16
2.00 d
Drag to reorder step 1
OSS ENG
1. GIS Duct Route &…
×3
Push Flow
C/T
38.3 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
2 / 1d
OEE
84.4%
i
Insert a step here
+
I
14
1.75 d
Drag to reorder step 2
CIVIL CREW
2. Air-Blown Micro-…
×4
Push Flow
C/T
43.9 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
3 / 1d
OEE
80.3%
i
Insert a step here
+
I
21
2.63 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. Mid-Span Splice …
×8
BOTTLENECK
C/T
1.0 h
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
2 / 1d
OEE
62.9%
i
Insert a step here
+
I
6
0.75 d
Drag to reorder step 4
FIELD TECH
4. Chromatic Disper…
×3
FIFO Lane
C/T
40.5 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
1 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
3
0.38 d
Drag to reorder step 5
NOC / OSS
5. Handover Test As…
×1
Continuous Flow
C/T
25.3 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
97.7%
i
Insert a step at the end
+
I
4
0.50 d
Finished Goods
OUT
2.00 d
VA 38.3 min
1.75 d
VA 43.9 min
2.63 d
VA 1.0 h
0.75 d
VA 40.5 min
0.38 d
VA 25.3 min
0.50 d
Total Lead Time
8.46 d
VA Time
3.5 h
PCE
5.48%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step