Colocation Data Center Fiber Cross-Connect SLA
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.14 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
49.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.67%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Meet-Me-Room Patch & Clean
44 < 68/day
Limit: downtime
Meet-Me-Room Patch & Clean: capacity 44/day vs demand 68/day. Main limit: downtime. Raw C/T 14.3 min, effective C/T 18.7 min.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€107,250
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
20.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carrier Meet-Me-Room
LC-APC Singlemode Patch…
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
Colocation Provider / DCIM
Geographic Zone Batching
CUSTOMER
Cloud & Fintech Tenan…
68 lines/d
Takt: 13.2 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
136
2.00 d
Drag to reorder step 1
OSS ENG
1. Customer LOA CFA…
×3
Push Flow
C/T
9.0 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
20 / 1d
OEE
86.7%
i
Insert a step here
+
I
122
1.79 d
Drag to reorder step 2
CIVIL CREW
2. Pathway Tray Rou…
×4
Push Flow
C/T
10.3 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
27 / 1d
OEE
84.4%
i
Insert a step here
+
I
177
2.60 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. Meet-Me-Room Pat…
×8
BOTTLENECK
C/T
14.3 min
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
20 / 1d
OEE
70.7%
i
Insert a step here
+
I
54
0.79 d
Drag to reorder step 4
FIELD TECH
4. Bi-Dir Light Met…
×3
FIFO Lane
C/T
9.5 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
10 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
27
0.40 d
Drag to reorder step 5
NOC / OSS
5. BGP Link Up Comp…
×1
Continuous Flow
C/T
6.0 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
96.0%
i
Insert a step at the end
+
I
34
0.50 d
Finished Goods
OUT
2.00 d
VA 9.0 min
1.79 d
VA 10.3 min
2.60 d
VA 14.3 min
0.79 d
VA 9.5 min
0.40 d
VA 6.0 min
0.50 d
Total Lead Time
8.14 d
VA Time
49.1 min
PCE
0.67%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step