Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
B2B Fleet IoT Global eSIM M2M Activation Flow
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.10 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Local Carrier Roaming Switch
780 < 1,200/day
Limit: downtime
Local Carrier Roaming Switch: capacity 780/day vs demand 1,200/day. Main limit: downtime. Raw C/T 49 s, effective C/T 64 s.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€63,180
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
366.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
GSMA SM-DP+ Profile S…
Automotive eUICC Modules
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
IoT Connectivity OSS
Geographic Zone Batching
CUSTOMER
Connected EV & Fleet …
1,200 lines/d
Takt: 45 s
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
2,400
2.00 d
Drag to reorder step 1
OSS ENG
1. IMSI Profile Poo…
×3
Push Flow
C/T
31 s
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
360 / 1d
OEE
86.7%
i
Insert a step here
+
I
2,160
1.80 d
Drag to reorder step 2
CIVIL CREW
2. Factory OTA Boot…
×4
Push Flow
C/T
35 s
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
480 / 1d
OEE
84.5%
i
Insert a step here
+
I
3,120
2.60 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. Local Carrier Ro…
×8
BOTTLENECK
C/T
49 s
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
360 / 1d
OEE
70.8%
i
Insert a step here
+
I
960
0.80 d
Drag to reorder step 4
FIELD TECH
4. APN Private Tunn…
×3
FIFO Lane
C/T
32 s
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
180 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
480
0.40 d
Drag to reorder step 5
NOC / OSS
5. Bulk Fleet Billi…
×1
Continuous Flow
C/T
20 s
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
120 / 1d
OEE
95.9%
i
Insert a step at the end
+
I
600
0.50 d
Finished Goods
OUT
2.00 d
VA 31 s
1.80 d
VA 35 s
2.60 d
VA 49 s
0.80 d
VA 32 s
0.40 d
VA 20 s
0.50 d
Total Lead Time
8.10 d
VA Time
2.8 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step