Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
MVNO Wholesale CDR Mediation & Invoice Cycle
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.24 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.88%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Unrated CDR Exception Fix
14 < 24/day
Limit: changeovers
Unrated CDR Exception Fix: capacity 14/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.3 min, effective C/T 26.5 min.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€131,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Host MNO Diameter/CDR…
Voice, SMS & Data Event…
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
Billing Mediation
Geographic Zone Batching
CUSTOMER
Retail MVNO Brands
24 batches/d
Takt: 18.8 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
48
2.00 d
Drag to reorder step 1
OSS ENG
1. Raw Diameter Tap…
×3
Push Flow
C/T
12.8 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
7 / 1d
OEE
85.0%
i
Insert a step here
+
I
43
1.79 d
Drag to reorder step 2
CIVIL CREW
2. Roaming TAP3 Tar…
×4
Push Flow
C/T
14.6 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
10 / 1d
OEE
81.1%
i
Insert a step here
+
I
62
2.58 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. Unrated CDR Exce…
×8
BOTTLENECK
C/T
20.3 min
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
7 / 1d
OEE
64.8%
i
Insert a step here
+
I
19
0.79 d
Drag to reorder step 4
FIELD TECH
4. Partner Invoice …
×3
FIFO Lane
C/T
13.5 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
4 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
10
0.42 d
Drag to reorder step 5
NOC / OSS
5. Finance GL Reven…
×1
Continuous Flow
C/T
8.4 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
92.9%
i
Insert a step at the end
+
I
12
0.50 d
Finished Goods
OUT
2.00 d
VA 12.8 min
1.79 d
VA 14.6 min
2.58 d
VA 20.3 min
0.79 d
VA 13.5 min
0.42 d
VA 8.4 min
0.50 d
Total Lead Time
8.24 d
VA Time
1.2 h
PCE
1.88%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step