Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.1 min
Lead Time (LT)
8.13 d
Value-Added
15.2 min
Efficiency (PCE)
0.41%
Bottleneck5G NR Tower Beam Aiming
66 < 110/day
Limit: changeovers
Quality (RTY)
77.8%
WIP Capital
€129,195
Carbon CO₂
33.6 t CO₂e/year