Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.19 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
SBC SIP Trunk Load Verification
27 < 45/day
Limit: changeovers
SBC SIP Trunk Load Verification: capacity 27/day vs demand 45/day. Main limit: changeovers. Raw C/T 10.8 min, effective C/T 14.1 min.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€52,925
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Donor National Telcos
DID Number Blocks & LOAs
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
VoIP OSS
Geographic Zone Batching
CUSTOMER
Corporate Call Centers
45 lines/d
Takt: 10.0 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
90
2.00 d
Drag to reorder step 1
OSS ENG
1. CSR & Authorized…
×3
Push Flow
C/T
6.8 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
14 / 1d
OEE
85.2%
i
Insert a step here
+
I
81
1.80 d
Drag to reorder step 2
CIVIL CREW
2. Donor Carrier NP…
×4
Push Flow
C/T
7.8 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
18 / 1d
OEE
80.8%
i
Insert a step here
+
I
117
2.60 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. SBC SIP Trunk Lo…
×8
BOTTLENECK
C/T
10.8 min
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
14 / 1d
OEE
65.5%
i
Insert a step here
+
I
36
0.80 d
Drag to reorder step 4
FIELD TECH
4. Exact-Minute Rou…
×3
FIFO Lane
C/T
7.2 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
7 / 1d
OEE
85.4%
i
FIFO
Insert a step here
+
I
18
0.40 d
Drag to reorder step 5
NOC / OSS
5. Inbound/Outbound…
×1
Continuous Flow
C/T
4.5 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
5 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
23
0.51 d
Finished Goods
OUT
2.00 d
VA 6.8 min
1.80 d
VA 7.8 min
2.60 d
VA 10.8 min
0.80 d
VA 7.2 min
0.40 d
VA 4.5 min
0.51 d
Total Lead Time
8.19 d
VA Time
37.1 min
PCE
1.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step