Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
10.0 min
Lead Time (LT)
8.19 d
Value-Added
37.1 min
Efficiency (PCE)
1.01%
BottleneckSBC SIP Trunk Load Verification
27 < 45/day
Limit: changeovers
Quality (RTY)
77.8%
WIP Capital
€52,925
Carbon CO₂
13.7 t CO₂e/year