Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
FTTH Fiber Drop & Service Activation
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.14 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.51%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Field Drop & Splicing
54 < 90/day
Limit: changeovers
Field Drop & Splicing: capacity 54/day vs demand 90/day. Main limit: changeovers. Raw C/T 5.4 min, effective C/T 7.1 min.
Quality (RTY)
77.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€138,510
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
27.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Fiber Optic & Civil O…
Drop Cables, ONTs & Spl…
Daily Van Replen · LT 3d
PRODUCTION CONTROL / ERP
OSS / Field Workforce FSM
Geographic Zone Batching
CUSTOMER
Broadband Subscribers
90 lines/d
Takt: 5.0 min
EDI / Scheduled Slot
MRP / Daily Van Replen
★ PACEMAKER
IN
Insert a step at the start
+
I
180
2.00 d
Drag to reorder step 1
OSS ENG
1. Permit & Splitte…
×3
Push Flow
C/T
3.4 min
C/O
5 min
Availability
95%
Quality FPY
93.0%
Batch / EPEI
27 / 1d
OEE
85.1%
i
Insert a step here
+
I
162
1.80 d
Drag to reorder step 2
CIVIL CREW
2. Civil Conduit Ch…
×4
Push Flow
C/T
3.9 min
C/O
15 min
Availability
92%
Quality FPY
95.8%
Batch / EPEI
36 / 1d
OEE
80.8%
i
Insert a step here
+
I
234
2.60 d
SMED
Pre-Termi…
Drag to reorder step 3
FIELD CREW
3. Field Drop & Spl…
×8
BOTTLENECK
C/T
5.4 min
C/O
20 min
Availability
84%
Quality FPY
91.0%
Batch / EPEI
27 / 1d
OEE
65.1%
i
Insert a step here
+
I
72
0.80 d
Drag to reorder step 4
FIELD TECH
4. OTDR & ONT Provi…
×3
FIFO Lane
C/T
3.6 min
C/O
5 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
14 / 1d
OEE
85.4%
i
FIFO
Insert a step here
+
I
36
0.40 d
Drag to reorder step 5
NOC / OSS
5. Billing Live Act…
×1
Continuous Flow
C/T
2.3 min
C/O
2 min
Availability
99%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
93.7%
i
Insert a step at the end
+
I
45
0.50 d
Finished Goods
OUT
2.00 d
VA 3.4 min
1.80 d
VA 3.9 min
2.60 d
VA 5.4 min
0.80 d
VA 3.6 min
0.40 d
VA 2.3 min
0.50 d
Total Lead Time
8.14 d
VA Time
18.6 min
PCE
0.51%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step