Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Meta-Aramid Firefighter Turnout Outer Shell Roll
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
26.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.62 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fluoro-Free DWR Dip & Cure
24 < 34/day
Limit: downtime
Fluoro-Free DWR Dip & Cure: capacity 24/day vs demand 34/day. Main limit: downtime. Raw C/T 28.6 min, effective C/T 35.9 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,873,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aramid Spun Yarn Prod…
Aramid Blended Yarns
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
Weave MES
Dye-Lot Shade Batch Push
CUSTOMER
Firefighter PPE Makers
34 batches/d
Takt: 26.5 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
54
1.59 d
Drag to reorder step 1
SPINNING MILL
1. Static-Free Beam…
×3
Continuous Flow
C/T
18.5 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
51 / 2d
OEE
90.5%
i
Insert a step here
+
I
61
1.79 d
Drag to reorder step 2
WEAVING HALL
2. Rigid Rapier Wea…
×3
Push Flow
C/T
22.2 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
51 / 2d
OEE
84.1%
i
Insert a step here
+
I
75
2.21 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. Fluoro-Free DWR …
×3
BOTTLENECK
C/T
28.6 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
41 / 2d
OEE
75.2%
i
Insert a step here
+
I
41
1.21 d
Drag to reorder step 4
FINISHING
4. Scour & Calender…
×2
FIFO Lane
C/T
20.1 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
20 / 1d
OEE
87.0%
i
FIFO
Insert a step here
+
I
31
0.91 d
Drag to reorder step 5
INSPECTION
5. ISO 15025 Flame …
×2
FIFO Lane
C/T
14.8 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
14 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
61
1.79 d
Finished Goods
OUT
1.59 d
VA 18.5 min
1.79 d
VA 22.2 min
2.21 d
VA 28.6 min
1.21 d
VA 20.1 min
0.91 d
VA 14.8 min
1.79 d
Total Lead Time
9.62 d
VA Time
1.7 h
PCE
1.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step