Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Needlepunch Recycled PET Automotive Trunk Felt
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.56 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.55%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Latex / PE Powder Spray Back
53 < 75/day
Limit: downtime
Latex / PE Powder Spray Back: capacity 53/day vs demand 75/day. Main limit: downtime. Raw C/T 19.4 min, effective C/T 24.4 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,390,350
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Recycled Bottle Stapl…
rPET 6dtex & Low-Melt F…
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
Carpet ERP
Dye-Lot Shade Batch Push
CUSTOMER
Auto Carpet Thermofor…
75 batches/d
Takt: 18.0 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
120
1.60 d
Drag to reorder step 1
SPINNING MILL
1. Fine Blend & Cro…
×3
Continuous Flow
C/T
12.6 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
113 / 2d
OEE
91.3%
i
Insert a step here
+
I
135
1.80 d
Drag to reorder step 2
WEAVING HALL
2. High-Density Bar…
×3
Push Flow
C/T
15.1 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
113 / 2d
OEE
85.3%
i
Insert a step here
+
I
165
2.20 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. Latex / PE Powde…
×3
BOTTLENECK
C/T
19.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
90 / 2d
OEE
76.7%
i
Insert a step here
+
I
90
1.20 d
Drag to reorder step 4
FINISHING
4. IR Stenter Bake …
×2
FIFO Lane
C/T
13.7 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
45 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
68
0.91 d
Drag to reorder step 5
INSPECTION
5. Airflow Acoustic…
×2
FIFO Lane
C/T
10.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
30 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
135
1.80 d
Finished Goods
OUT
1.60 d
VA 12.6 min
1.80 d
VA 15.1 min
2.20 d
VA 19.4 min
1.20 d
VA 13.7 min
0.91 d
VA 10.1 min
1.80 d
Total Lead Time
9.56 d
VA Time
1.2 h
PCE
0.55%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step