Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Unidirectional Wind-Spar Carbon Tow Prepreg Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.59 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.98%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Heated Impregnation Compaction
30 < 42/day
Limit: downtime
Heated Impregnation Compaction: capacity 30/day vs demand 42/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.6 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,473,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
22.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Industrial 24K Carbon…
Carbon Tow & Toughened …
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
CompMES
Dye-Lot Shade Batch Push
CUSTOMER
Wind Blade & Auto Pre…
42 batches/d
Takt: 32.1 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
67
1.60 d
Drag to reorder step 1
SPINNING MILL
1. 120-Spool Precis…
×3
Continuous Flow
C/T
22.5 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
63 / 2d
OEE
91.3%
i
Insert a step here
+
I
76
1.81 d
Drag to reorder step 2
WEAVING HALL
2. Epoxy Resin Film…
×3
Push Flow
C/T
27.0 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
63 / 2d
OEE
85.3%
i
Insert a step here
+
I
92
2.19 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. Heated Impregnat…
×3
BOTTLENECK
C/T
34.7 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
50 / 2d
OEE
76.7%
i
Insert a step here
+
I
50
1.19 d
Drag to reorder step 4
FINISHING
4. Chill Drum & PE …
×2
FIFO Lane
C/T
24.4 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
25 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
38
0.90 d
Drag to reorder step 5
INSPECTION
5. Freezer Roll -18…
×2
FIFO Lane
C/T
18.0 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
76
1.81 d
Finished Goods
OUT
1.60 d
VA 22.5 min
1.81 d
VA 27.0 min
2.19 d
VA 34.7 min
1.19 d
VA 24.4 min
0.90 d
VA 18.0 min
1.81 d
Total Lead Time
9.59 d
VA Time
2.1 h
PCE
0.98%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step