Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Ozone & Laser Distressed Denim Jeans Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
23 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
85 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
3D Laser Whisker & Ozone Wash
1,702 < 2,400/day
Limit: downtime
3D Laser Whisker & Ozone Wash: capacity 1,702/day vs demand 2,400/day. Main limit: downtime. Raw C/T 24 s, effective C/T 30 s.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€399,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
185.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Premium denim mills
Stretch Ring-Spun Indigo
Weekly Mill · LT 5d
PRODUCTION CONTROL / ERP
Quick-Response ERP
Large Bundle Push System
CUSTOMER
Global Denim Retailers
2,400 garments/d
Takt: 23 s
EDI / 3x / week
MRP / Weekly Mill
★ PACEMAKER
IN
Insert a step at the start
+
I
3,840
1.60 d
Drag to reorder step 1
CUTTING ROOM
1. CAD Marker Nest …
×3
Push Flow
C/T
14 s
C/O
30 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
3600 / 2d
OEE
91.8%
i
Insert a step here
+
I
3,360
1.40 d
Drag to reorder step 2
PREP ZONE
2. Twin-Needle Chai…
×4
Push Flow
C/T
16 s
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
1920 / 1d
OEE
89.7%
i
Insert a step here
+
I
5,760
2.40 d
BALANCING
One-Piece…
Drag to reorder step 3
SEWING HALL
3. 3D Laser Whisker…
×16
BOTTLENECK
C/T
24 s
C/O
45 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
2400 / 2d
OEE
76.0%
i
Insert a step here
+
I
3,120
1.30 d
Drag to reorder step 4
FINISHING
4. Rivet Press & St…
×4
Push Flow
C/T
18 s
C/O
15 min
Availability
92%
Quality FPY
97.5%
Batch / EPEI
1440 / 1d
OEE
87.2%
i
Insert a step here
+
I
2,160
0.90 d
Drag to reorder step 5
QUALITY PACK
5. AQL 2.5 Shade & …
×3
FIFO Lane
C/T
13 s
C/O
10 min
Availability
96%
Quality FPY
98.5%
Batch / EPEI
960 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
3,360
1.40 d
Finished Goods
OUT
1.60 d
VA 14 s
1.40 d
VA 16 s
2.40 d
VA 24 s
1.30 d
VA 18 s
0.90 d
VA 13 s
1.40 d
Total Lead Time
9.00 d
VA Time
85 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step