Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Rope-Dyed Indigo & Air-Jet Shuttleless Denim Mill
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.57 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.63%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
400-PPM Air-Jet Weaving
46 < 65/day
Limit: downtime
400-PPM Air-Jet Weaving: capacity 46/day vs demand 65/day. Main limit: downtime. Raw C/T 22.4 min, effective C/T 28.2 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,977,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
34.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Open-End / Ring Slub …
Pure Indigo Vat & Elast…
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
TextileERP
Dye-Lot Shade Batch Push
CUSTOMER
Global Denim Cut-Sew …
65 batches/d
Takt: 20.8 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
104
1.60 d
Drag to reorder step 1
SPINNING MILL
1. Ball Warping & R…
×3
Continuous Flow
C/T
14.5 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
98 / 2d
OEE
91.3%
i
Insert a step here
+
I
117
1.80 d
Drag to reorder step 2
WEAVING HALL
2. Sizing & Beaming…
×3
Push Flow
C/T
17.5 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
98 / 2d
OEE
85.3%
i
Insert a step here
+
I
143
2.20 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. 400-PPM Air-Jet …
×3
BOTTLENECK
C/T
22.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
78 / 2d
OEE
76.7%
i
Insert a step here
+
I
78
1.20 d
Drag to reorder step 4
FINISHING
4. Singeing, Wash &…
×2
FIFO Lane
C/T
15.8 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
39 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
59
0.91 d
Drag to reorder step 5
INSPECTION
5. 4-Point Laser Ro…
×2
FIFO Lane
C/T
11.6 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
26 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
117
1.80 d
Finished Goods
OUT
1.60 d
VA 14.5 min
1.80 d
VA 17.5 min
2.20 d
VA 22.4 min
1.20 d
VA 15.8 min
0.91 d
VA 11.6 min
1.80 d
Total Lead Time
9.57 d
VA Time
1.4 h
PCE
0.63%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step