Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
1200g High-Tensile Geosynthetic Drainage Felt
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.55 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
56.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.43%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Heat Calender Thermal Bond
67 < 95/day
Limit: downtime
Heat Calender Thermal Bond: capacity 67/day vs demand 95/day. Main limit: downtime. Raw C/T 15.4 min, effective C/T 19.3 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,065,540
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
49.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
UV-Stabilized Virgin …
Coarse Denier Staple PP
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
GeoMES
Dye-Lot Shade Batch Push
CUSTOMER
Civil Highway Contrac…
95 tonnes/d
Takt: 14.2 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
152
1.60 d
Drag to reorder step 1
SPINNING MILL
1. Carding & Broad …
×3
Continuous Flow
C/T
10.0 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
143 / 2d
OEE
91.3%
i
Insert a step here
+
I
171
1.80 d
Drag to reorder step 2
WEAVING HALL
2. Heavy Multi-Boar…
×3
Push Flow
C/T
11.9 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
143 / 2d
OEE
85.3%
i
Insert a step here
+
I
209
2.20 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. Heat Calender Th…
×3
BOTTLENECK
C/T
15.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
114 / 2d
OEE
76.7%
i
Insert a step here
+
I
114
1.20 d
Drag to reorder step 4
FINISHING
4. Edge Meter Stamp…
×2
FIFO Lane
C/T
10.8 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
57 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
86
0.91 d
Drag to reorder step 5
INSPECTION
5. CBR Puncture & T…
×2
FIFO Lane
C/T
8.0 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
38 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
171
1.80 d
Finished Goods
OUT
1.60 d
VA 10.0 min
1.80 d
VA 11.9 min
2.20 d
VA 15.4 min
1.20 d
VA 10.8 min
0.91 d
VA 8.0 min
1.80 d
Total Lead Time
9.55 d
VA Time
56.0 min
PCE
0.43%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step