Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
2116 Electrical-Grade Woven E-Glass Fabric Roll
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
19.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.56 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.61%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Epoxy-Silane Wet Finish Coat
48 < 68/day
Limit: downtime
Epoxy-Silane Wet Finish Coat: capacity 48/day vs demand 68/day. Main limit: downtime. Raw C/T 21.4 min, effective C/T 26.9 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,808,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
35.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
E-Glass Fiber Bobbins
Ultra-Fine Glass Filame…
Weekly Fiber · LT 7d
PRODUCTION CONTROL / ERP
Glass Weave ERP
Dye-Lot Shade Batch Push
CUSTOMER
Copper-Clad Laminate …
68 batches/d
Takt: 19.9 min
EDI / Daily Roll Truck
MRP / Weekly Fiber
★ PACEMAKER
IN
Insert a step at the start
+
I
109
1.60 d
Drag to reorder step 1
SPINNING MILL
1. Air-Jet Glass Fi…
×3
Continuous Flow
C/T
13.9 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
102 / 2d
OEE
91.3%
i
Insert a step here
+
I
122
1.79 d
Drag to reorder step 2
WEAVING HALL
2. Heat Cleaning Si…
×3
Push Flow
C/T
16.7 min
C/O
55 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
102 / 2d
OEE
85.3%
i
Insert a step here
+
I
150
2.21 d
QUALITY
Spectro F…
Drag to reorder step 3
DYE HOUSE
3. Epoxy-Silane Wet…
×3
BOTTLENECK
C/T
21.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
82 / 2d
OEE
76.7%
i
Insert a step here
+
I
82
1.21 d
Drag to reorder step 4
FINISHING
4. Precision Stente…
×2
FIFO Lane
C/T
15.1 min
C/O
25 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
41 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
61
0.90 d
Drag to reorder step 5
INSPECTION
5. Optical Fuzz & Y…
×2
FIFO Lane
C/T
11.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
27 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
122
1.79 d
Finished Goods
OUT
1.60 d
VA 13.9 min
1.79 d
VA 16.7 min
2.21 d
VA 21.4 min
1.21 d
VA 15.1 min
0.90 d
VA 11.1 min
1.79 d
Total Lead Time
9.56 d
VA Time
1.3 h
PCE
0.61%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step