Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.2 min
Lead Time (LT)
9.03 d
Value-Added
12.2 min
Efficiency (PCE)
0.30%
BottleneckSaddle Stitch & 4-Coat Edge
94 < 140/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€352,800
Carbon CO₂
10.8 t CO₂e/year