Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
39 s
Lead Time (LT)
9.00 d
Value-Added
2.4 min
Efficiency (PCE)
0.03%
BottleneckLasting & Dual-Density PU Mold
1,001 < 1,400/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€428,400
Carbon CO₂
108.3 t CO₂e/year