Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Chlorine-Proof Recycled Nylon Bikini & Swim Trunks
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
26 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
98 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Elastic Flatlock & Padding
1,492 < 2,100/day
Limit: downtime
Elastic Flatlock & Padding: capacity 1,492/day vs demand 2,100/day. Main limit: downtime. Raw C/T 28 s, effective C/T 34 s.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€255,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
162.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Recycled Elastane Yarn
PBT Chlorine-Resistant …
Weekly Mill · LT 5d
PRODUCTION CONTROL / ERP
Quick-Response ERP
Large Bundle Push System
CUSTOMER
Summer Resort Retail
2,100 garments/d
Takt: 26 s
EDI / 3x / week
MRP / Weekly Mill
★ PACEMAKER
IN
Insert a step at the start
+
I
3,360
1.60 d
Drag to reorder step 1
CUTTING ROOM
1. Tension-Free Spr…
×3
Push Flow
C/T
17 s
C/O
30 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
3150 / 2d
OEE
91.8%
i
Insert a step here
+
I
2,940
1.40 d
Drag to reorder step 2
PREP ZONE
2. Ultrasonic Seam …
×4
Push Flow
C/T
19 s
C/O
20 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
1680 / 1d
OEE
89.7%
i
Insert a step here
+
I
5,040
2.40 d
BALANCING
One-Piece…
Drag to reorder step 3
SEWING HALL
3. Elastic Flatlock…
×16
BOTTLENECK
C/T
28 s
C/O
45 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
2100 / 2d
OEE
76.0%
i
Insert a step here
+
I
2,730
1.30 d
Drag to reorder step 4
FINISHING
4. High-Temp Stretc…
×4
Push Flow
C/T
20 s
C/O
15 min
Availability
92%
Quality FPY
97.5%
Batch / EPEI
1260 / 1d
OEE
87.2%
i
Insert a step here
+
I
1,890
0.90 d
Drag to reorder step 5
QUALITY PACK
5. Hygiene Liner & …
×3
FIFO Lane
C/T
15 s
C/O
10 min
Availability
96%
Quality FPY
98.5%
Batch / EPEI
840 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
2,940
1.40 d
Finished Goods
OUT
1.60 d
VA 17 s
1.40 d
VA 19 s
2.40 d
VA 28 s
1.30 d
VA 20 s
0.90 d
VA 15 s
1.40 d
Total Lead Time
9.00 d
VA Time
98 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step