Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
19.9 min
Lead Time (LT)
3.66 d
Value-Added
1.2 h
Efficiency (PCE)
1.48%
BottleneckHydrogen Peroxide Fog Sanitize
49 < 68/day
Limit: downtime
Quality (RTY)
89.6%
WIP Capital
€15,925
Carbon CO₂
9.2 t CO₂e/year