Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Highway Electronic ETC Tag Provisioning
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
117 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Plate-to-OBU Crypto Pair
550 < 850/day
Limit: changeovers
Plate-to-OBU Crypto Pair: capacity 550/day vs demand 850/day. Main limit: changeovers. Raw C/T 34 s, effective C/T 42 s.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€42,840
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
114.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
DSRC Microwave Transp…
Pre-Encoded Toll OBUs
24/7 Schedule · LT 1d
PRODUCTION CONTROL / ERP
TollCloud ERP
Peak Wave Queue Bottleneck
CUSTOMER
Commuters & Trucking …
850 units/d
Takt: 32 s
EDI / Fixed Headway
MRP / 24/7 Schedule
★ PACEMAKER
IN
Insert a step at the start
+
I
510
0.60 d
Drag to reorder step 1
CONCOURSE/DOCK
1. Portal / Gas-Sta…
×3
FIFO Lane
C/T
20 s
C/O
5 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
170 / 1d
OEE
90.1%
i
FIFO
Insert a step here
+
I
1,020
1.20 d
FLOW
CT 3D Sca…
Drag to reorder step 2
SECURITY/SORT
2. Plate-to-OBU Cry…
×4
BOTTLENECK
C/T
34 s
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
128 / 1d
OEE
69.3%
i
Insert a step here
+
I
595
0.70 d
Drag to reorder step 3
TRANSFER LOOP
3. Auto-Topup Card …
×3
FIFO Lane
C/T
25 s
C/O
8 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
128 / 1d
OEE
81.3%
i
FIFO
Insert a step here
+
I
425
0.50 d
Drag to reorder step 4
DISPATCH BAY
4. Laser Address Ma…
×3
FIFO Lane
C/T
23 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
128 / 1d
OEE
82.8%
i
FIFO
Insert a step here
+
I
255
0.30 d
Drag to reorder step 5
DEPARTURE GATE
5. Highway Gantry F…
×2
Continuous Flow
C/T
16 s
C/O
4 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
85 / 1d
OEE
88.8%
i
Insert a step at the end
+
I
255
0.30 d
Finished Goods
OUT
0.60 d
VA 20 s
1.20 d
VA 34 s
0.70 d
VA 25 s
0.50 d
VA 23 s
0.30 d
VA 16 s
0.30 d
Total Lead Time
3.60 d
VA Time
117 s
PCE
0.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step