Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated ANPR Airport Taxi Dispatch Pool Lot
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
EV Clean-Air Priority Lane
1,304 < 1,800/day
Limit: downtime
EV Clean-Air Priority Lane: capacity 1,304/day vs demand 1,800/day. Main limit: downtime. Raw C/T 48 s, effective C/T 59 s.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€16,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
242.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
City Licensed Taxis /…
Waiting Fleet Drivers
24/7 Schedule · LT 1d
PRODUCTION CONTROL / ERP
QueuePool OS
Peak Wave Queue Bottleneck
CUSTOMER
Arriving Terminal Fly…
1,800 orders/d
Takt: 45 s
EDI / Fixed Headway
MRP / 24/7 Schedule
★ PACEMAKER
IN
Insert a step at the start
+
I
1,080
0.60 d
Drag to reorder step 1
CONCOURSE/DOCK
1. Geofence Staging…
×3
FIFO Lane
C/T
28 s
C/O
5 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
360 / 1d
OEE
93.7%
i
FIFO
Insert a step here
+
I
2,160
1.20 d
FLOW
CT 3D Sca…
Drag to reorder step 2
SECURITY/SORT
2. EV Clean-Air Pri…
×4
BOTTLENECK
C/T
48 s
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
270 / 1d
OEE
77.3%
i
Insert a step here
+
I
1,260
0.70 d
Drag to reorder step 3
TRANSFER LOOP
3. Terminal Curb De…
×3
FIFO Lane
C/T
35 s
C/O
8 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
270 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
900
0.50 d
Drag to reorder step 4
DISPATCH BAY
4. Barrier Gate Dis…
×3
FIFO Lane
C/T
32 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
270 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
540
0.30 d
Drag to reorder step 5
DEPARTURE GATE
5. Curb Pax Load in…
×2
Continuous Flow
C/T
23 s
C/O
4 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
180 / 1d
OEE
94.5%
i
Insert a step at the end
+
I
540
0.30 d
Finished Goods
OUT
0.60 d
VA 28 s
1.20 d
VA 48 s
0.70 d
VA 35 s
0.50 d
VA 32 s
0.30 d
VA 23 s
0.30 d
Total Lead Time
3.60 d
VA Time
2.8 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step