Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commuter EMU Train Bogie Brake Pad & HVAC Pit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.74 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.11%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pit Inspection & Pad Change
17 < 24/day
Limit: downtime
Pit Inspection & Pad Change: capacity 17/day vs demand 24/day. Main limit: downtime. Raw C/T 40.1 min, effective C/T 49.4 min.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€55,040
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
UIC Brake Discs & Fil…
Commuter Rail Sets
24/7 Schedule · LT 1d
PRODUCTION CONTROL / ERP
RailMaint ERP
Peak Wave Queue Bottleneck
CUSTOMER
Regional Rail Passeng…
24 units/d
Takt: 37.5 min
EDI / Fixed Headway
MRP / 24/7 Schedule
★ PACEMAKER
IN
Insert a step at the start
+
I
14
0.58 d
Drag to reorder step 1
CONCOURSE/DOCK
1. Depot Track Shun…
×3
FIFO Lane
C/T
23.3 min
C/O
5 min
Availability
97%
Quality FPY
98.4%
Batch / EPEI
5 / 1d
OEE
92.9%
i
FIFO
Insert a step here
+
I
29
1.21 d
FLOW
CT 3D Sca…
Drag to reorder step 2
SECURITY/SORT
2. Pit Inspection &…
×4
BOTTLENECK
C/T
40.1 min
C/O
10 min
Availability
86%
Quality FPY
94.5%
Batch / EPEI
4 / 1d
OEE
75.9%
i
Insert a step here
+
I
17
0.71 d
Drag to reorder step 3
TRANSFER LOOP
3. Pneumatic Door &…
×3
FIFO Lane
C/T
29.3 min
C/O
8 min
Availability
94%
Quality FPY
98.1%
Batch / EPEI
4 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
12
0.50 d
Drag to reorder step 4
DISPATCH BAY
4. Saloon Graffiti …
×3
FIFO Lane
C/T
27.0 min
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
4 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
7
0.29 d
Drag to reorder step 5
DEPARTURE GATE
5. ATP Signalling &…
×2
Continuous Flow
C/T
18.8 min
C/O
4 min
Availability
98%
Quality FPY
99.4%
Batch / EPEI
2 / 1d
OEE
92.2%
i
Insert a step at the end
+
I
7
0.29 d
Finished Goods
OUT
0.58 d
VA 23.3 min
1.21 d
VA 40.1 min
0.71 d
VA 29.3 min
0.50 d
VA 27.0 min
0.29 d
VA 18.8 min
0.29 d
Total Lead Time
3.74 d
VA Time
2.3 h
PCE
4.11%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step