Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.7 min
Lead Time (LT)
3.66 d
Value-Added
17.5 min
Efficiency (PCE)
1.06%
BottleneckSide-Loader Automated Lift
61 < 95/day
Limit: changeovers
Quality (RTY)
89.6%
WIP Capital
€61,920
Carbon CO₂
12.8 t CO₂e/year