Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Red-Bag Hospital Bio-Waste Autoclave Shred Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.87 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
138°C 40-Min Pathogen Hold
35 < 48/day
Limit: downtime
138°C 40-Min Pathogen Hold: capacity 35/day vs demand 48/day. Main limit: downtime. Raw C/T 20.1 min, effective C/T 24.9 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€136,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
76.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Regional Clinics & Ho…
Sealed Red Infectious B…
Continuous Feed · LT 2d
PRODUCTION CONTROL / ERP
MedWaste Track
Clogged Screen / Membrane Hold
CUSTOMER
Municipal Clean Landf…
48 tonnes/d
Takt: 18.8 min
EDI / Continuous Pipe/Bale
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
58
1.21 d
Drag to reorder step 1
INTAKE DECK
1. Barcode Bin Mani…
×2
Continuous Flow
C/T
12.0 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
38 / 1d
OEE
91.6%
i
Insert a step here
+
I
62
1.29 d
Drag to reorder step 2
PRE-STAGE
2. Pre-Shred Vacuum…
×2
Push Flow
C/T
15.0 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
29 / 1d
OEE
86.3%
i
Insert a step here
+
I
86
1.79 d
GREEN
Pressure-…
Drag to reorder step 3
CORE SKID
3. 138°C 40-Min Pat…
×2
BOTTLENECK
C/T
20.1 min
C/O
30 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
38 / 2d
OEE
77.1%
i
Insert a step here
+
I
43
0.90 d
Drag to reorder step 4
FINISH STAGE
4. Dewater Compacti…
×2
FIFO Lane
C/T
13.5 min
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
19 / 1d
OEE
91.2%
i
FIFO
Insert a step here
+
I
29
0.60 d
Drag to reorder step 5
QUALITY OUT
5. Daily Geobacillu…
×1
Continuous Flow
C/T
10.1 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
12 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
48
1.00 d
Finished Goods
OUT
1.21 d
VA 12.0 min
1.29 d
VA 15.0 min
1.79 d
VA 20.1 min
0.90 d
VA 13.5 min
0.60 d
VA 10.1 min
1.00 d
Total Lead Time
6.87 d
VA Time
1.2 h
PCE
1.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step