Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
12.3 min
Lead Time (LT)
6.83 d
Value-Added
46.3 min
Efficiency (PCE)
0.50%
Bottleneck85°C Caustic Friction Wash
80 < 110/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€463,760
Carbon CO₂
175.0 t CO₂e/year