Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.6 min
Lead Time (LT)
6.82 d
Value-Added
21.2 min
Efficiency (PCE)
0.23%
Bottleneck65-Bar Isobaric RO Trains
176 < 240/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€799,680
Carbon CO₂
381.9 t CO₂e/year