Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
15.0 min
Lead Time (LT)
6.84 d
Value-Added
56.6 min
Efficiency (PCE)
0.61%
Bottleneck1150°C Rotary Kiln & 2s After
66 < 90/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€599,760
Carbon CO₂
143.2 t CO₂e/year