Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.4 min
Lead Time (LT)
6.81 d
Value-Added
8.9 min
Efficiency (PCE)
0.15%
BottleneckOptical NIR + AI Robot Pick
274 < 380/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€478,040
Carbon CO₂
604.7 t CO₂e/year