Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
14.2 min
Lead Time (LT)
6.85 d
Value-Added
53.6 min
Efficiency (PCE)
0.58%
BottleneckCentrifuge Poly Dewater 32%
69 < 95/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€116,460
Carbon CO₂
151.2 t CO₂e/year