Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
12.5 min
Lead Time (LT)
6.91 d
Value-Added
47.1 min
Efficiency (PCE)
1.52%
BottleneckRoot-Cutting & Silt Vac Suction
25 < 36/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€93,100
Carbon CO₂
57.3 t CO₂e/year