Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
30.0 min
Lead Time (LT)
6.91 d
Value-Added
1.9 h
Efficiency (PCE)
1.21%
BottleneckSyn-Gas Condense to Pyro-Oil
33 < 45/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€141,220
Carbon CO₂
71.6 t CO₂e/year