Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.82 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
28.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CEDI Electrodeionization Skid
131 < 180/day
Limit: downtime
CEDI Electrodeionization Skid: capacity 131/day vs demand 180/day. Main limit: downtime. Raw C/T 8.0 min, effective C/T 10.0 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€465,120
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
286.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Municipal Feed + Chem…
RO, EDI & Mixed-Bed Res…
Continuous Feed · LT 2d
PRODUCTION CONTROL / ERP
UPW SCADA
Clogged Screen / Membrane Hold
CUSTOMER
300mm Wafer Fabs
180 batches/d
Takt: 7.5 min
EDI / Continuous Pipe/Bale
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
216
1.20 d
Drag to reorder step 1
INTAKE DECK
1. Double-Pass RO +…
×2
Continuous Flow
C/T
4.8 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
144 / 1d
OEE
92.3%
i
Insert a step here
+
I
234
1.30 d
Drag to reorder step 2
PRE-STAGE
2. 185nm UV TOC Oxi…
×2
Push Flow
C/T
6.0 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
108 / 1d
OEE
87.4%
i
Insert a step here
+
I
324
1.80 d
GREEN
Pressure-…
Drag to reorder step 3
CORE SKID
3. CEDI Electrodeio…
×2
BOTTLENECK
C/T
8.0 min
C/O
30 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
144 / 2d
OEE
78.2%
i
Insert a step here
+
I
162
0.90 d
Drag to reorder step 4
FINISH STAGE
4. 0.02um Sub-Nanom…
×2
FIFO Lane
C/T
5.4 min
C/O
10 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
72 / 1d
OEE
92.1%
i
FIFO
Insert a step here
+
I
108
0.60 d
Drag to reorder step 5
QUALITY OUT
5. Online PPT Parti…
×1
Continuous Flow
C/T
4.1 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
45 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
180
1.00 d
Finished Goods
OUT
1.20 d
VA 4.8 min
1.30 d
VA 6.0 min
1.80 d
VA 8.0 min
0.90 d
VA 5.4 min
0.60 d
VA 4.1 min
1.00 d
Total Lead Time
6.82 d
VA Time
28.3 min
PCE
0.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step