Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
20.8 min
Lead Time (LT)
6.87 d
Value-Added
1.3 h
Efficiency (PCE)
0.84%
BottleneckMVC Vapor Recompression Evap
48 < 65/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€642,350
Carbon CO₂
103.4 t CO₂e/year