Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Wood-Veneer Slatted Recycled PET Acoustic Wall
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
83 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.21 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Automatic Felt-to-Slat Glue
466 < 650/day
Limit: downtime
Automatic Felt-to-Slat Glue: capacity 466/day vs demand 650/day. Main limit: downtime. Raw C/T 89 s, effective C/T 111 s.
Quality (RTY)
88.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€223,860
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
326.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Black Recycled PET Fe…
9mm PET Felt & Oak MDF
2x / week · LT 5d
PRODUCTION CONTROL / ERP
WoodMES
Order Batch Nesting Push
CUSTOMER
Architect & Commercia…
650 parts/d
Takt: 83 s
EDI / Daily Box Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,040
1.60 d
Drag to reorder step 1
MILL PREP
1. MDF Acoustic Ven…
×2
Push Flow
C/T
56 s
C/O
18 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
650 / 1d
OEE
92.0%
i
Insert a step here
+
I
910
1.40 d
Drag to reorder step 2
PRESS BAY
2. Multi-Blade Rip …
×2
Push Flow
C/T
65 s
C/O
22 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
390 / 1d
OEE
87.4%
i
Insert a step here
+
I
1,300
2.00 d
GREEN
UV Fast-C…
Drag to reorder step 3
FINISH BAY
3. Automatic Felt-t…
×3
BOTTLENECK
C/T
89 s
C/O
35 min
Availability
85%
Quality FPY
94.0%
Batch / EPEI
650 / 2d
OEE
76.8%
i
Insert a step here
+
I
650
1.00 d
Drag to reorder step 4
CNC DRILLING
4. Nail-Free Stapli…
×2
FIFO Lane
C/T
61 s
C/O
15 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
260 / 1d
OEE
87.0%
i
FIFO
Insert a step here
+
I
520
0.80 d
Drag to reorder step 5
PACKING
5. Shrink Twin-Pack…
×2
Continuous Flow
C/T
47 s
C/O
8 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
195 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
910
1.40 d
Finished Goods
OUT
1.60 d
VA 56 s
1.40 d
VA 65 s
2.00 d
VA 89 s
1.00 d
VA 61 s
0.80 d
VA 47 s
1.40 d
Total Lead Time
8.21 d
VA Time
5.3 min
PCE
0.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step