Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.6 min
Lead Time (LT)
8.22 d
Value-Added
21.6 min
Efficiency (PCE)
0.29%
BottleneckFR Molded Foam & FR Fabric Trim
115 < 160/day
Limit: downtime
Quality (RTY)
88.2%
WIP Capital
€255,840
Carbon CO₂
80.3 t CO₂e/year