Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Tip-Up Fire-Retardant Auditorium Cinema Seat
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.22 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
21.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.29%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
FR Molded Foam & FR Fabric Trim
115 < 160/day
Limit: downtime
FR Molded Foam & FR Fabric Trim: capacity 115/day vs demand 160/day. Main limit: downtime. Raw C/T 6.0 min, effective C/T 7.5 min.
Quality (RTY)
88.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€255,840
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
80.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Die-Cast Stanchions &…
Bent Beech Shells & FR …
2x / week · LT 5d
PRODUCTION CONTROL / ERP
SeatERP
Order Batch Nesting Push
CUSTOMER
Theaters & Universiti…
160 units/d
Takt: 5.6 min
EDI / Daily Box Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
256
1.60 d
Drag to reorder step 1
MILL PREP
1. Steam-Bent Beech…
×2
Push Flow
C/T
3.8 min
C/O
18 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
160 / 1d
OEE
92.0%
i
Insert a step here
+
I
224
1.40 d
Drag to reorder step 2
PRESS BAY
2. Acoustic Bottom …
×2
Push Flow
C/T
4.4 min
C/O
22 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
96 / 1d
OEE
87.4%
i
Insert a step here
+
I
320
2.00 d
GREEN
UV Fast-C…
Drag to reorder step 3
FINISH BAY
3. FR Molded Foam &…
×3
BOTTLENECK
C/T
6.0 min
C/O
35 min
Availability
85%
Quality FPY
94.0%
Batch / EPEI
160 / 2d
OEE
76.8%
i
Insert a step here
+
I
160
1.00 d
Drag to reorder step 4
CNC DRILLING
4. Gravity Counterw…
×2
FIFO Lane
C/T
4.2 min
C/O
15 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
64 / 1d
OEE
87.0%
i
FIFO
Insert a step here
+
I
128
0.80 d
Drag to reorder step 5
PACKING
5. 20,000-Tip Life …
×2
Continuous Flow
C/T
3.2 min
C/O
8 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
48 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
224
1.40 d
Finished Goods
OUT
1.60 d
VA 3.8 min
1.40 d
VA 4.4 min
2.00 d
VA 6.0 min
1.00 d
VA 4.2 min
0.80 d
VA 3.2 min
1.40 d
Total Lead Time
8.22 d
VA Time
21.6 min
PCE
0.29%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step