Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Carbonized High-Density Thermo-Bamboo Decking
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
79 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
2500T High-Density Hot Press
488 < 680/day
Limit: downtime
2500T High-Density Hot Press: capacity 488/day vs demand 680/day. Main limit: downtime. Raw C/T 86 s, effective C/T 107 s.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€240,448
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
709.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Moso 5-Yr Harvested B…
Shredded Bamboo & Pheno…
Daily Log Trucks · LT 3d
PRODUCTION CONTROL / ERP
WoodERP
Kiln Batch Moisture Queue
CUSTOMER
Landscape & Marina Bu…
680 parts/d
Takt: 79 s
EDI / Flatbed Rail/Truck
MRP / Daily Log Trucks
★ PACEMAKER
IN
Insert a step at the start
+
I
1,224
1.80 d
Drag to reorder step 1
HEAD RIG
1. Split, Crush & S…
×2
Continuous Flow
C/T
52 s
C/O
20 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
1020 / 2d
OEE
91.1%
i
Insert a step here
+
I
1,088
1.60 d
Drag to reorder step 2
PLANER BAY
2. Kiln Dry & Dip P…
×2
Push Flow
C/T
65 s
C/O
25 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
680 / 2d
OEE
86.3%
i
Insert a step here
+
I
1,904
2.80 d
TPM
In-Kiln A…
Drag to reorder step 3
KILN/PRESS
3. 2500T High-Densi…
×2
BOTTLENECK
C/T
86 s
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
1020 / 2d
OEE
77.8%
i
Insert a step here
+
I
816
1.20 d
Drag to reorder step 4
JOINERY CNC
4. Diamond T&G Clip…
×2
FIFO Lane
C/T
59 s
C/O
20 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
340 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
680
1.00 d
Drag to reorder step 5
TIMBER YARD
5. UV Oil Coat & St…
×2
FIFO Lane
C/T
44 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
272 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
1,360
2.00 d
Finished Goods
OUT
1.80 d
VA 52 s
1.60 d
VA 65 s
2.80 d
VA 86 s
1.20 d
VA 59 s
1.00 d
VA 44 s
2.00 d
Total Lead Time
10.4 d
VA Time
5.1 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step