Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
85 s
Lead Time (LT)
10.4 d
Value-Added
5.5 min
Efficiency (PCE)
0.04%
BottleneckJet Veneer Dryer & Patching
693 < 950/day
Limit: downtime
Quality (RTY)
89.8%
WIP Capital
€454,480
Carbon CO₂
990.7 t CO₂e/year