Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Mass-Timber Cross-Laminated Timber (CLT) Press
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cross-Lay PUR Glue Vacuum Press
20 < 28/day
Limit: downtime
Cross-Lay PUR Glue Vacuum Press: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.1 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€480,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
29.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
C24 Spruce Finger-Joi…
Pur Adhesive & Spruce L…
Daily Log Trucks · LT 3d
PRODUCTION CONTROL / ERP
TimberBIM ERP
Kiln Batch Moisture Queue
CUSTOMER
Mass-Timber Multi-Sto…
28 parts/d
Takt: 32.1 min
EDI / Flatbed Rail/Truck
MRP / Daily Log Trucks
★ PACEMAKER
IN
Insert a step at the start
+
I
50
1.79 d
Drag to reorder step 1
HEAD RIG
1. Moisture & E-Mod…
×2
Continuous Flow
C/T
21.2 min
C/O
20 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
42 / 2d
OEE
91.1%
i
Insert a step here
+
I
45
1.61 d
Drag to reorder step 2
PLANER BAY
2. Twin-Face Finger…
×2
Push Flow
C/T
26.4 min
C/O
25 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
28 / 2d
OEE
86.3%
i
Insert a step here
+
I
78
2.79 d
TPM
In-Kiln A…
Drag to reorder step 3
KILN/PRESS
3. Cross-Lay PUR Gl…
×2
BOTTLENECK
C/T
34.7 min
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
42 / 2d
OEE
77.8%
i
Insert a step here
+
I
34
1.21 d
Drag to reorder step 4
JOINERY CNC
4. 5-Axis Giant Por…
×2
FIFO Lane
C/T
23.8 min
C/O
20 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
14 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
28
1.00 d
Drag to reorder step 5
TIMBER YARD
5. Crane Lifting Ey…
×2
FIFO Lane
C/T
18.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
11 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
56
2.00 d
Finished Goods
OUT
1.79 d
VA 21.2 min
1.61 d
VA 26.4 min
2.79 d
VA 34.7 min
1.21 d
VA 23.8 min
1.00 d
VA 18.0 min
2.00 d
Total Lead Time
10.5 d
VA Time
2.1 h
PCE
1.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step