Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
EI-30 Fire-Rated Acoustic Flush Interior Door
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.21 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
5-Axis Hinge & Lock Mortise
244 < 340/day
Limit: downtime
5-Axis Hinge & Lock Mortise: capacity 244/day vs demand 340/day. Main limit: downtime. Raw C/T 2.8 min, effective C/T 3.5 min.
Quality (RTY)
88.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€404,260
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
170.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
HPL Skins & Flaxboard…
Solid Flax Core & Intum…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
DoorMES
Order Batch Nesting Push
CUSTOMER
Commercial Towers & H…
340 units/d
Takt: 2.6 min
EDI / Daily Box Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
544
1.60 d
Drag to reorder step 1
MILL PREP
1. Intumescent Rail…
×2
Push Flow
C/T
108 s
C/O
18 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
340 / 1d
OEE
92.0%
i
Insert a step here
+
I
476
1.40 d
Drag to reorder step 2
PRESS BAY
2. HPL Skin Hot Pre…
×2
Push Flow
C/T
2.1 min
C/O
22 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
204 / 1d
OEE
87.4%
i
Insert a step here
+
I
680
2.00 d
GREEN
UV Fast-C…
Drag to reorder step 3
FINISH BAY
3. 5-Axis Hinge & L…
×3
BOTTLENECK
C/T
2.8 min
C/O
35 min
Availability
85%
Quality FPY
94.0%
Batch / EPEI
340 / 2d
OEE
76.8%
i
Insert a step here
+
I
340
1.00 d
Drag to reorder step 4
CNC DRILLING
4. CPL Wrap & Pre-H…
×2
FIFO Lane
C/T
118 s
C/O
15 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
136 / 1d
OEE
87.0%
i
FIFO
Insert a step here
+
I
272
0.80 d
Drag to reorder step 5
PACKING
5. Foam Guard Wrap …
×2
Continuous Flow
C/T
89 s
C/O
8 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
102 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
476
1.40 d
Finished Goods
OUT
1.60 d
VA 108 s
1.40 d
VA 2.1 min
2.00 d
VA 2.8 min
1.00 d
VA 118 s
0.80 d
VA 89 s
1.40 d
Total Lead Time
8.21 d
VA Time
10.2 min
PCE
0.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step