Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
225L Bordeaux Toasted French Oak Wine Barrel
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Precision Controlled Flame Toast
97 < 140/day
Limit: downtime
Precision Controlled Flame Toast: capacity 97/day vs demand 140/day. Main limit: downtime. Raw C/T 3.5 min, effective C/T 4.3 min.
Quality (RTY)
89.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,135,680
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
146.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
24-Month Air-Dried Tr…
Split Heartwood French …
Daily Log Trucks · LT 3d
PRODUCTION CONTROL / ERP
CooperERP
Kiln Batch Moisture Queue
CUSTOMER
Premier Cru Wineries
140 units/d
Takt: 3.2 min
EDI / Flatbed Rail/Truck
MRP / Daily Log Trucks
★ PACEMAKER
IN
Insert a step at the start
+
I
252
1.80 d
Drag to reorder step 1
HEAD RIG
1. Jointer Taper & …
×2
Continuous Flow
C/T
2.1 min
C/O
20 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
210 / 2d
OEE
89.8%
i
Insert a step here
+
I
224
1.60 d
Drag to reorder step 2
PLANER BAY
2. Hoop Raise & Ste…
×2
Push Flow
C/T
2.6 min
C/O
25 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
140 / 2d
OEE
83.9%
i
Insert a step here
+
I
392
2.80 d
TPM
In-Kiln A…
Drag to reorder step 3
KILN/PRESS
3. Precision Contro…
×2
BOTTLENECK
C/T
3.5 min
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
210 / 2d
OEE
75.1%
i
Insert a step here
+
I
168
1.20 d
Drag to reorder step 4
JOINERY CNC
4. Croze Groove & L…
×2
FIFO Lane
C/T
2.4 min
C/O
20 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
70 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
140
1.00 d
Drag to reorder step 5
TIMBER YARD
5. Water Pressure C…
×2
FIFO Lane
C/T
108 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
56 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
280
2.00 d
Finished Goods
OUT
1.80 d
VA 2.1 min
1.60 d
VA 2.6 min
2.80 d
VA 3.5 min
1.20 d
VA 2.4 min
1.00 d
VA 108 s
2.00 d
Total Lead Time
10.4 d
VA Time
12.4 min
PCE
0.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step