Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Solid French Oak Butterfly-Extension Dining Table
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.26 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
26.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.71%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Wide-Belt Calibrating Sander
45 < 65/day
Limit: downtime
Wide-Belt Calibrating Sander: capacity 45/day vs demand 65/day. Main limit: downtime. Raw C/T 7.4 min, effective C/T 9.3 min.
Quality (RTY)
88.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€218,530
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
32.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
PEFC French White Oak
Kiln-Dried 40mm Oak Sta…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
WoodERP
Order Batch Nesting Push
CUSTOMER
Home & Design Retaile…
65 units/d
Takt: 6.9 min
EDI / Daily Box Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
104
1.60 d
Drag to reorder step 1
MILL PREP
1. Rip, Finger-Join…
×2
Push Flow
C/T
4.7 min
C/O
18 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
65 / 1d
OEE
90.1%
i
Insert a step here
+
I
91
1.40 d
Drag to reorder step 2
PRESS BAY
2. 5-Axis CNC Bevel…
×2
Push Flow
C/T
5.4 min
C/O
22 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
39 / 1d
OEE
83.7%
i
Insert a step here
+
I
130
2.00 d
GREEN
UV Fast-C…
Drag to reorder step 3
FINISH BAY
3. Wide-Belt Calibr…
×3
BOTTLENECK
C/T
7.4 min
C/O
35 min
Availability
85%
Quality FPY
94.0%
Batch / EPEI
65 / 2d
OEE
73.7%
i
Insert a step here
+
I
65
1.00 d
Drag to reorder step 4
CNC DRILLING
4. Oil-Wax Roll & C…
×2
FIFO Lane
C/T
5.1 min
C/O
15 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
26 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
52
0.80 d
Drag to reorder step 5
PACKING
5. Felt Pad, Hardwa…
×2
Continuous Flow
C/T
3.9 min
C/O
8 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
20 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
91
1.40 d
Finished Goods
OUT
1.60 d
VA 4.7 min
1.40 d
VA 5.4 min
2.00 d
VA 7.4 min
1.00 d
VA 5.1 min
0.80 d
VA 3.9 min
1.40 d
Total Lead Time
8.26 d
VA Time
26.5 min
PCE
0.71%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step